Permit: TR-UTL-0725-01130
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2717 E PINAL VISTA
Address NEW:
2717 E PINAL VISTA
Apply Date:
07/14/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
TR-UTL-0725-01130 Las Vistas Main Replacement Phase 2 project, Approx 3828LF of main line replacement and 60 new service lines
Permit Reviews
Permit Number - TR-UTL-0725-01130
Permit Status: Complete
Permit Description: TR-UTL-0725-01130
Las Vistas Main Replacement Phase 2 project, Approx 3828LF of main line replacement and 60 new service lines
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01130
Permit Status: Complete
Permit Description: TR-UTL-0725-01130
Las Vistas Main Replacement Phase 2 project, Approx 3828LF of main line replacement and 60 new service lines
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 07/14/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01130
Permit Description: TR-UTL-0725-01130
Las Vistas Main Replacement Phase 2 project, Approx 3828LF of main line replacement and 60 new service lines
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/29/2025 | TRSP - ROW - Bituminous Treatment | Passed | ||
| 09/22/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/22/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/22/2025 | TRSP - ROW - Final | Passed |