Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1411 E BILBY RD UNIT 3
Apply Date:
07/14/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 1411 E BILBY RD UNIT 1,2,3

Permit Reviews

Permit Number - TR-UTL-0725-01127
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 1411 E BILBY RD UNIT 1,2,3
Start Date Submittal Complete Date Status  
07/14/2025 RIGHT-OF-WAY REVIEW v.1 07/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01127
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 1411 E BILBY RD UNIT 1,2,3
Total Outstanding Activity Conditions - 3
Date Name
07/14/2025 PRE-CON/PAVEMENT/SIDEWALK
07/14/2025 Traffic Control set-up approved between 7AM - 5PM
07/14/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0725-01127
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 1411 E BILBY RD UNIT 1,2,3
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/16/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
09/16/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0725-01127
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)20'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 1411 E BILBY RD UNIT 1,2,3
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1411 E BILBY RD TCP_V1.PDF DOCUMENTS VIEW
1411 E BILBY RD UNIT 3_V1.PDF DOCUMENTS VIEW