Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
207 W FLORES ST
Address NEW:
207 W FLORES ST
Apply Date:
07/10/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE Permit update 9/16/2025: Renewal request for 30 days as of 9/20/2025.

Permit Reviews

Permit Number - TR-UTL-0725-01108
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE Permit update 9/16/2025: Renewal request for 30 days as of 9/20/2025.
Start Date Submittal Complete Date Status  
08/20/2025 RIGHT-OF-WAY REVIEW v.2 08/20/2025 APPROVED Review Details
07/10/2025 RIGHT-OF-WAY REVIEW v.1 07/11/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01108
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE Permit update 9/16/2025: Renewal request for 30 days as of 9/20/2025.
Total Outstanding Activity Conditions - 2
Date Name
07/10/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/10/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01108
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE Permit update 9/16/2025: Renewal request for 30 days as of 9/20/2025.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/07/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/07/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/24/2025 TRSP - ROW - Final Passed