Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6719 E 17TH ST
Address NEW:
6719 E 17TH ST
Apply Date:
07/08/2025
Applicant:
Alexander Bellmore
Description:
Replacement project - Approx. 1,322' of boring under dirt with an approx. 479' trench in pavement. Crews working along 17th St and Mann Ave and in the alleys north and south of 17th St.

Permit Reviews

Permit Number - TR-UTL-0725-01091
Permit Status: Complete
Permit Description: Replacement project - Approx. 1,322' of boring under dirt with an approx. 479' trench in pavement. Crews working along 17th St and Mann Ave and in the alleys north and south of 17th St.
Start Date Submittal Complete Date Status  
07/09/2025 RIGHT-OF-WAY REVIEW v.1 07/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01091
Permit Status: Complete
Permit Description: Replacement project - Approx. 1,322' of boring under dirt with an approx. 479' trench in pavement. Crews working along 17th St and Mann Ave and in the alleys north and south of 17th St.
Total Outstanding Activity Conditions - 4
Date Name
07/09/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/09/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/09/2025 Traffic Control set-up approved between 7AM - 5PM
07/09/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01091
Permit Description: Replacement project - Approx. 1,322' of boring under dirt with an approx. 479' trench in pavement. Crews working along 17th St and Mann Ave and in the alleys north and south of 17th St.
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
09/25/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/20/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
36_4953083_V1.PDF DOCUMENTS VIEW
6719 E 17TH ST 4953083 AERIAL SITE PLAN_V1.PDF DOCUMENTS VIEW
MANN AVE PROJECT - TCP_V1.PDF DOCUMENTS VIEW