Permit: TR-UTL-0725-01082
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3675 E BRITANNIA DR
Address NEW:
3675 E BRITANNIA DR
Apply Date:
07/07/2025
Applicant:
ANGEL MORALES
Description:
Scope Revision - P.291606 - Bore 784', Trench 76', Dog 6 Pits, Place 4 New HH's/PEDS, Remove/Replace 40 SQFT of Asphalt, Remove/Replace 32 SQFT of Concrete, and Access HH 19871 for Splicing ( 9/29/2025 Updated) Original Scope - P.291606 - BORE 774', DIG 4 PITS, REMOVE/ REPLACE PED WITH BIGSHOT PED & PLACE 2 NEW HHs, & ACCESS HH 19871 & HH 21592 FOR SPLICING 9/3/25- RENEWAL FOR 90 DAYS AS OF 9/7/25. NEW EXPIRATION DATE IS 12/8/25 10/24/2025 - Per Revision Narrative - Adding existing MH 16801 & MH 18211 access for fiber optic splicing only
Permit Reviews
Permit Number - TR-UTL-0725-01082
Permit Status: Complete
Permit Description: Scope Revision - P.291606 - Bore 784', Trench 76', Dog 6 Pits, Place 4 New HH's/PEDS, Remove/Replace 40 SQFT of Asphalt, Remove/Replace 32 SQFT of Concrete, and Access HH 19871 for Splicing ( 9/29/2025 Updated)
Original Scope - P.291606 - BORE 774', DIG 4 PITS, REMOVE/ REPLACE PED WITH BIGSHOT PED & PLACE 2 NEW HHs, & ACCESS HH 19871 & HH 21592 FOR SPLICING
9/3/25- RENEWAL FOR 90 DAYS AS OF 9/7/25. NEW EXPIRATION DATE IS 12/8/25
10/24/2025 - Per Revision Narrative - Adding existing MH 16801 & MH 18211 access for fiber optic splicing only
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/31/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 07/31/2025 | APPROVED |
| 07/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2025 | APPROVED |
| 10/22/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 10/24/2025 | APPROVED |
| 09/24/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 09/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01082
Permit Status: Complete
Permit Description: Scope Revision - P.291606 - Bore 784', Trench 76', Dog 6 Pits, Place 4 New HH's/PEDS, Remove/Replace 40 SQFT of Asphalt, Remove/Replace 32 SQFT of Concrete, and Access HH 19871 for Splicing ( 9/29/2025 Updated)
Original Scope - P.291606 - BORE 774', DIG 4 PITS, REMOVE/ REPLACE PED WITH BIGSHOT PED & PLACE 2 NEW HHs, & ACCESS HH 19871 & HH 21592 FOR SPLICING
9/3/25- RENEWAL FOR 90 DAYS AS OF 9/7/25. NEW EXPIRATION DATE IS 12/8/25
10/24/2025 - Per Revision Narrative - Adding existing MH 16801 & MH 18211 access for fiber optic splicing only
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 07/07/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 07/07/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 07/07/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 07/07/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/07/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 07/07/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/07/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/07/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01082
Permit Description: Scope Revision - P.291606 - Bore 784', Trench 76', Dog 6 Pits, Place 4 New HH's/PEDS, Remove/Replace 40 SQFT of Asphalt, Remove/Replace 32 SQFT of Concrete, and Access HH 19871 for Splicing ( 9/29/2025 Updated)
Original Scope - P.291606 - BORE 774', DIG 4 PITS, REMOVE/ REPLACE PED WITH BIGSHOT PED & PLACE 2 NEW HHs, & ACCESS HH 19871 & HH 21592 FOR SPLICING
9/3/25- RENEWAL FOR 90 DAYS AS OF 9/7/25. NEW EXPIRATION DATE IS 12/8/25
10/24/2025 - Per Revision Narrative - Adding existing MH 16801 & MH 18211 access for fiber optic splicing only
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/05/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 09/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 09/08/2025 | TRSP - ROW - Final | Passed | Work is complete |