Permit: TR-UTL-0725-01063
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1000 S GREASEWOOD RD
Address NEW:
1000 S GREASEWOOD RD
Apply Date:
07/02/2025
Applicant:
Desert Barricades LLC
Description:
WO T109640 - TEP to underground overhead facilities on Anklam from Camino Santiago to Greasewood and facilities on Greasewood to Starr Pass. TEP to install 2 pull boxes, 1 J2 cabinet, 1 single phase transformer, 1 J1 cabinet, 2 switchgear cabinets, 2 – 6” riser. TEP to install 2 – 6” conduits, 4” and 2.5” conduit for distribution facilities.
Permit Reviews
Permit Number - TR-UTL-0725-01063
Permit Status: Inspections
Permit Description: WO T109640 - TEP to underground overhead facilities on Anklam from Camino Santiago to Greasewood and facilities on Greasewood to Starr Pass. TEP to install 2 pull boxes, 1 J2 cabinet, 1 single phase transformer, 1 J1 cabinet, 2 switchgear cabinets, 2 – 6” riser. TEP to install 2 – 6” conduits, 4” and 2.5” conduit for distribution facilities.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/16/2025 | REQUIRES RESUBMIT |
| 07/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2025 | REQUIRES RESUBMIT |
| 10/27/2025 | RIGHT-OF-WAY REVIEW v.3 | 10/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01063
Permit Status: Inspections
Permit Description: WO T109640 - TEP to underground overhead facilities on Anklam from Camino Santiago to Greasewood and facilities on Greasewood to Starr Pass. TEP to install 2 pull boxes, 1 J2 cabinet, 1 single phase transformer, 1 J1 cabinet, 2 switchgear cabinets, 2 – 6” riser. TEP to install 2 – 6” conduits, 4” and 2.5” conduit for distribution facilities.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/03/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/03/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/03/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 07/16/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 07/16/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0725-01063
Permite Description: WO T109640 - TEP to underground overhead facilities on Anklam from Camino Santiago to Greasewood and facilities on Greasewood to Starr Pass. TEP to install 2 pull boxes, 1 J2 cabinet, 1 single phase transformer, 1 J1 cabinet, 2 switchgear cabinets, 2 – 6” riser. TEP to install 2 – 6” conduits, 4” and 2.5” conduit for distribution facilities.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
| 02/06/2026 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0725-01063
Permit Description: WO T109640 - TEP to underground overhead facilities on Anklam from Camino Santiago to Greasewood and facilities on Greasewood to Starr Pass. TEP to install 2 pull boxes, 1 J2 cabinet, 1 single phase transformer, 1 J1 cabinet, 2 switchgear cabinets, 2 – 6” riser. TEP to install 2 – 6” conduits, 4” and 2.5” conduit for distribution facilities.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/06/2026 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/06/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed |