Permit: TR-UTL-0725-01058
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1041 N SANTA ROSA AV
Address NEW:
1041 N SANTA ROSA AV
Apply Date:
07/02/2025
Applicant:
Chelsey Bolinger
Description:
P.101673 (KAHNA) - TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET.
Permit Reviews
Permit Number - TR-UTL-0725-01058
Permit Status: Complete
Permit Description: P.101673 (KAHNA) - TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01058
Permit Status: Complete
Permit Description: P.101673 (KAHNA) - TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/02/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/03/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 07/03/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 07/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01058
Permit Description: P.101673 (KAHNA) - TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/01/2025 | TRSP - ROW - Final | Passed |