Permit: TR-UTL-0725-01044
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5971 E JUAREZ ST
Address NEW:
5971 E JUAREZ ST
Apply Date:
07/01/2025
Applicant:
luis granillo
Description:
wo3050347 5971 e juarez st 14-14-24 ne main or svc repair north side of lot in dirt alley 4LF/sc
Permit Reviews
Permit Number - TR-UTL-0725-01044
Permit Status: Complete
Permit Description: wo3050347 5971 e juarez st 14-14-24 ne main or svc repair north side of lot in dirt alley 4LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01044
Permit Status: Complete
Permit Description: wo3050347 5971 e juarez st 14-14-24 ne main or svc repair north side of lot in dirt alley 4LF/sc
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/01/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/01/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 07/01/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01044
Permit Description: wo3050347 5971 e juarez st 14-14-24 ne main or svc repair north side of lot in dirt alley 4LF/sc
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Emergency work is now complete | |
| 07/28/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work has been completed | |
| 07/28/2025 | TRSP - ROW - Final | Passed | Work is now complete |