PRJ275345-3- Cox to place 2 NEW 24"x36"x24" vaults, and bore total 744ft and total trench 6ft for system tie in.
Permit Reviews
Permit Number - TR-UTL-0724-01416
Permit Status: Complete
Permit Description: PRJ275345-3- Cox to place 2 NEW 24"x36"x24" vaults, and bore total 744ft and total trench 6ft for system tie in.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01416
Permit Status: Complete
Permit Description: PRJ275345-3- Cox to place 2 NEW 24"x36"x24" vaults, and bore total 744ft and total trench 6ft for system tie in.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/31/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual |
| 07/31/2024 | Traffic/Mobility Control Plan (MCP) approved as submitted. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01416
Permit Description: PRJ275345-3- Cox to place 2 NEW 24"x36"x24" vaults, and bore total 744ft and total trench 6ft for system tie in.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | job complete, all barricades removed | |
| 09/17/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | no asphalt impact on job | |
| 09/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre con held 8/20 covered activity with Rich an Travis Horness | |
| 09/17/2024 | TRSP - ROW - Barricade Takedown | Passed | all barricades removed, job complete | |
| 09/17/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | backfill around new vaults inspected and approved | |
| 09/17/2024 | TRSP - ROW - Final | Passed | all site work complete |