Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8006 S FARMBELT DR
Apply Date:
07/30/2024
Applicant:
Caitlin Southwest
Description:
PRJ275345-1-Cox to R&R 1 pedestal location, also INSTALL NEW 24"x36"x24" vault at 2 locations, will also pull 1624ft of (1) 288ct fiber thru existing Cox conduit for system tie in.

Permit Reviews

Permit Number - TR-UTL-0724-01414
Permit Status: Complete
Permit Description: PRJ275345-1-Cox to R&R 1 pedestal location, also INSTALL NEW 24"x36"x24" vault at 2 locations, will also pull 1624ft of (1) 288ct fiber thru existing Cox conduit for system tie in.
Start Date Submittal Complete Date Status  
07/30/2024 RIGHT-OF-WAY REVIEW v.1 08/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0724-01414
Permit Status: Complete
Permit Description: PRJ275345-1-Cox to R&R 1 pedestal location, also INSTALL NEW 24"x36"x24" vault at 2 locations, will also pull 1624ft of (1) 288ct fiber thru existing Cox conduit for system tie in.
Total Outstanding Activity Conditions - 1
Date Name
07/31/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0724-01414
Permit Description: PRJ275345-1-Cox to R&R 1 pedestal location, also INSTALL NEW 24"x36"x24" vault at 2 locations, will also pull 1624ft of (1) 288ct fiber thru existing Cox conduit for system tie in.
Total Completed Inspections - 6
Date Description Inspector Results Comments
08/20/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed elm to come and locate for the entire length of site. once elm is completed work will begin
09/16/2024 TRSP - ROW - Barricade - Setup/Routine Passed all elements removed
09/16/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed roadway patch approved
09/16/2024 TRSP - ROW - Barricade Takedown Passed all elements removed
09/16/2024 TRSP - ROW - Backfill - Placement/Compaction Passed backfill around vaults and pedestals inspected and approved
09/16/2024 TRSP - ROW - Final Passed job site cleaned and completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ275345-1-24-0215 PULL TCP_V1.PDF DOCUMENTS VIEW
PRJ275345-1-AERIAL SITE PLAN PULL_V1.PDF DOCUMENTS VIEW