Permit: TR-UTL-0724-01389
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8625 E RUBY DR
Address NEW:
8625 E RUBY DR
Apply Date:
07/29/2024
Applicant:
Chelsey Bolinger
Description:
P.067195E KAHNA – BORE 3,177' & TRENCH 188’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 225’ OF AERIAL FIBER CABLE. IN ALLEY BETWEEN E FOND DU LAC DR & E RUBY DR, ALSO ON RUBY DR IN THE ROAD**
Permit Reviews
Permit Number - TR-UTL-0724-01389
Permit Status: Complete
Permit Description: P.067195E KAHNA – BORE 3,177' & TRENCH 188’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 225’ OF AERIAL FIBER CABLE. IN ALLEY BETWEEN E FOND DU LAC DR & E RUBY DR, ALSO ON RUBY DR IN THE ROAD**
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/01/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01389
Permit Status: Complete
Permit Description: P.067195E KAHNA – BORE 3,177' & TRENCH 188’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 225’ OF AERIAL FIBER CABLE. IN ALLEY BETWEEN E FOND DU LAC DR & E RUBY DR, ALSO ON RUBY DR IN THE ROAD**
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/30/2024 | ALLEY |
| 07/30/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 07/30/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 07/30/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01389
Permite Description: P.067195E KAHNA – BORE 3,177' & TRENCH 188’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 225’ OF AERIAL FIBER CABLE. IN ALLEY BETWEEN E FOND DU LAC DR & E RUBY DR, ALSO ON RUBY DR IN THE ROAD**
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Not Applicable | No sidewalk/Hardscape restoration needed on this permit |
| 02/20/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Not Applicable | No sidewalk/Hardscape restoration required on this permit |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01389
Permit Description: P.067195E KAHNA – BORE 3,177' & TRENCH 188’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 225’ OF AERIAL FIBER CABLE. IN ALLEY BETWEEN E FOND DU LAC DR & E RUBY DR, ALSO ON RUBY DR IN THE ROAD**
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | Pothole core restored in non-moratorium Street, approved | |
| 02/20/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Pre-con completed on 11/6 | |
| 02/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Backfill performed in alleyways and landscape areas behind sidewalks, native soil compacted to 85%, approved | |
| 02/20/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | aerial work, continuing down Camino Seco from permit B, down riser into underground, approved | |
| 02/20/2025 | TRSP - ROW - Final | Passed | all prior inspections passed, traffic control removed from site, job completed |