Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0724-01385
Permit Details
Apply Date:
07/29/2024
Applicant:
DOONE BAKER
Description:
P.067195A KAHNA – BORE 2,717' & TRENCH 176’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (20) HANDHOLES & (7) PEDESTALS. OVERLASH 1,615’ OF AERIAL FIBER CABLE. ** IN ALLEYS BETWEEN GOLF LINKS RD AND PENA BLANCA DR**
Permit Reviews
Permit Number - TR-UTL-0724-01385
Permit Status: Renewal/extension fees due
Permit Description: P.067195A KAHNA – BORE 2,717' & TRENCH 176’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (20) HANDHOLES & (7) PEDESTALS. OVERLASH 1,615’ OF AERIAL FIBER CABLE. ** IN ALLEYS BETWEEN GOLF LINKS RD AND PENA BLANCA DR**
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/30/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/30/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01385
Permit Status: Renewal/extension fees due
Permit Description: P.067195A KAHNA – BORE 2,717' & TRENCH 176’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (20) HANDHOLES & (7) PEDESTALS. OVERLASH 1,615’ OF AERIAL FIBER CABLE. ** IN ALLEYS BETWEEN GOLF LINKS RD AND PENA BLANCA DR**
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/30/2024 | ALLEY |
07/30/2024 | PAVEMENT MORATORIUM |
07/30/2024 | PRE-CON/PAVEMENT/SIDEWALK |
07/30/2024 | PROP 411 |
07/30/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Renewal/Extension Fees Due
Permit Number: TR-UTL-0724-01385
Permit Description: P.067195A KAHNA – BORE 2,717' & TRENCH 176’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (20) HANDHOLES & (7) PEDESTALS. OVERLASH 1,615’ OF AERIAL FIBER CABLE. ** IN ALLEYS BETWEEN GOLF LINKS RD AND PENA BLANCA DR**
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Robert, discussed work, timeline, and areas of work, starting job at 9:30 today |