Permit: TR-UTL-0724-01377
Permit Details
Apply Date:
07/25/2024
Applicant:
Tucson Water
Description:
Installing 1" water service with 1" POT meter, abandon existing 1.5" service
Permit Reviews
Permit Number - TR-UTL-0724-01377
Permit Status: Complete
Permit Description: Installing 1" water service with 1" POT meter, abandon existing 1.5" service
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01377
Permit Status: Complete
Permit Description: Installing 1" water service with 1" POT meter, abandon existing 1.5" service
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/26/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
07/26/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01377
Permite Description: Installing 1" water service with 1" POT meter, abandon existing 1.5" service
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01377
Permit Description: Installing 1" water service with 1" POT meter, abandon existing 1.5" service
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
09/03/2024 | TRSP - ROW - Final | Passed |