Permit: TR-UTL-0724-01376
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3315 N EUCLID AV
Address NEW:
3315 N EUCLID AV
Apply Date:
07/25/2024
Applicant:
JUAN PEREZ
Description:
Excavating a 50x3 trench to replace gas line service in row in asphalt and dirt.
Permit Reviews
Permit Number - TR-UTL-0724-01376
Permit Status: Complete
Permit Description: Excavating a 50x3 trench to replace gas line service in row in asphalt and dirt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01376
Permit Status: Complete
Permit Description: Excavating a 50x3 trench to replace gas line service in row in asphalt and dirt.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/25/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 07/25/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01376
Permite Description: Excavating a 50x3 trench to replace gas line service in row in asphalt and dirt.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Canceled | |
| 09/05/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Canceled | |
| 09/05/2024 | TRSP - ROW - Barricade Takedown | N/A | Canceled | |
| 09/05/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Canceled | |
| 09/05/2024 | TRSP - ROW - Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01376
Permit Description: Excavating a 50x3 trench to replace gas line service in row in asphalt and dirt.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 08/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/20/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/20/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/20/2025 | TRSP - ROW - Final | Passed |