Description:
Crews will be potholing to confirm location and depth of gas lines for the COT Houghton Improvement Project. Traffic control plan will close Houghton's Northbound right lane and right hand turn lane, as well as Irvington's Westbound lane.
Permit Reviews
Permit Number - TR-UTL-0724-01348
Permit Status: Complete
Permit Description: Crews will be potholing to confirm location and depth of gas lines for the COT Houghton Improvement Project. Traffic control plan will close Houghton's Northbound right lane and right hand turn lane, as well as Irvington's Westbound lane.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/22/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/16/2024 | REQUIRES RESUBMIT |
08/19/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01348
Permit Status: Complete
Permit Description: Crews will be potholing to confirm location and depth of gas lines for the COT Houghton Improvement Project. Traffic control plan will close Houghton's Northbound right lane and right hand turn lane, as well as Irvington's Westbound lane.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
07/22/2024 | Traffic control set-up approved between 9AM - 3:30PM |
07/22/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
07/22/2024 | NOTE: WORK IS SOUTHEAST ON S HOUGHTON & E IRVINGTON - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01348
Permit Description: Crews will be potholing to confirm location and depth of gas lines for the COT Houghton Improvement Project. Traffic control plan will close Houghton's Northbound right lane and right hand turn lane, as well as Irvington's Westbound lane.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | traffic control set up not witnessed, work complete | |
10/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre con held on 9/30 with Mike Brevin and SW Gas | |
10/22/2024 | TRSP - ROW - Barricade Takedown | Passed | all traffic control elements removed | |
10/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | temporary backfill and patch in place, permanent slurry to be added once work on TR-UTL-0924-01834 for roadway widening starts | |
10/22/2024 | TRSP - ROW - Final | Passed | potholing complete with temporary patches, permanent slurry and asphalt to occur on roadway widening job | |
10/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | No impact to curbs or Hardscape | |
10/22/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | no impact to Hardscape or curbs |