Permit: TR-UTL-0724-01345
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
60 S CARLTON PARK PL
Address NEW:
60 S CARLTON PARK PL
Apply Date:
07/19/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE A (1) 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT S CARLTON PARK PL
Permit Reviews
Permit Number - TR-UTL-0724-01345
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A (1) 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT S CARLTON PARK PL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/19/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01345
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A (1) 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT S CARLTON PARK PL
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/19/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 07/19/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0724-01345
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A (1) 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT S CARLTON PARK PL
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0724-01345
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A (1) 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT S CARLTON PARK PL
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/07/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/23/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/23/2024 | TRSP - ROW - Barricade Takedown | Passed |