Permit: TR-UTL-0724-01339
Permit Details
Apply Date:
07/17/2024
Applicant:
Vickie McCambridge
Description:
Tie point will be existing Comcast plant on pole. Riser down pole and bore. Bore 220' of 2" conduit at a depth of 3'. Run 220' of .625 coax cable. Place new pedestal (10X22).
Permit Reviews
Permit Number - TR-UTL-0724-01339
Permit Status: Complete
Permit Description: Tie point will be existing Comcast plant on pole. Riser down pole and bore. Bore 220' of 2" conduit at a depth of 3'. Run 220' of .625 coax cable. Place new pedestal (10X22).
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/31/2024 | RIGHT-OF-WAY REVIEW v.2 | 07/31/2024 | APPROVED |
07/17/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/30/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01339
Permit Status: Complete
Permit Description: Tie point will be existing Comcast plant on pole. Riser down pole and bore. Bore 220' of 2" conduit at a depth of 3'. Run 220' of .625 coax cable. Place new pedestal (10X22).
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/17/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
07/17/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01339
Permit Description: Tie point will be existing Comcast plant on pole. Riser down pole and bore. Bore 220' of 2" conduit at a depth of 3'. Run 220' of .625 coax cable. Place new pedestal (10X22).
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/02/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
10/02/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
10/02/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
10/02/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
10/02/2024 | TRSP - ROW - Final | Passed |