Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
222 S CHERRY AV
Address NEW:
222 S CHERRY AV
Apply Date:
07/15/2024
Applicant:
Ilana Galluzzo
Description:
3' x 6' BELL HOLE IN DIRT/PAVEMENT ALONG WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT. CREWS WILL BE WORKING ACROSS E 12TH ST.

Permit Reviews

Permit Number - TR-UTL-0724-01317
Permit Status: Complete
Permit Description: 3' x 6' BELL HOLE IN DIRT/PAVEMENT ALONG WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT. CREWS WILL BE WORKING ACROSS E 12TH ST.
Start Date Submittal Complete Date Status  
07/15/2024 RIGHT-OF-WAY REVIEW v.1 07/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0724-01317
Permit Status: Complete
Permit Description: 3' x 6' BELL HOLE IN DIRT/PAVEMENT ALONG WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT. CREWS WILL BE WORKING ACROSS E 12TH ST.
Total Outstanding Activity Conditions - 2
Date Name
07/15/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/15/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0724-01317
Permit Description: 3' x 6' BELL HOLE IN DIRT/PAVEMENT ALONG WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT. CREWS WILL BE WORKING ACROSS E 12TH ST.
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/22/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/20/2024 TRSP - ROW - Barricade - Setup/Routine Passed
09/20/2024 TRSP - ROW - Barricade Takedown Passed
09/20/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
09/20/2024 TRSP - ROW - Final Passed