Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
07/15/2024
Applicant:
BeaJaye Laprath
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT 2334 S QUAIL HOLLOW DR

Permit Reviews

Permit Number - TR-UTL-0724-01316
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT 2334 S QUAIL HOLLOW DR
Start Date Submittal Complete Date Status  
07/15/2024 RIGHT-OF-WAY REVIEW v.1 07/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0724-01316
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT 2334 S QUAIL HOLLOW DR
Total Outstanding Activity Conditions - 3
Date Name
07/15/2024 Traffic Control set-up approved between 7AM - 5PM
07/15/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
07/15/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0724-01316
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON GAS SERVICE AT 2334 S QUAIL HOLLOW DR
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed precon done on phone. no seal coat required onsite.
10/18/2024 TRSP - ROW - Barricade - Setup/Routine Passed no work done
10/18/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
10/18/2024 TRSP - ROW - Barricade Takedown Passed no work done
10/18/2024 TRSP - ROW - Backfill - Placement/Compaction Passed no work done
10/18/2024 TRSP - ROW - Final Passed No work done

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
2334 S QUAIL HOLLOW DR TCP_V1.PDF DOCUMENTS VIEW
2334 S QUAIL HOLLOW DR_V1.PDF DOCUMENTS VIEW