Permit: TR-UTL-0724-01292
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7544 E 29TH ST
Address NEW:
7544 E 29TH ST
Apply Date:
07/10/2024
Applicant:
Chelsey Bolinger
Description:
P.067192C (KAHNA) - BORE 199' & TRENCH 30’ TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,751’ OF AERIAL FIBER CABLE. Permit update 10/18/2024: Renewed for 90 days
Permit Reviews
Permit Number - TR-UTL-0724-01292
Permit Status: Complete
Permit Description: P.067192C (KAHNA) - BORE 199' & TRENCH 30’ TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,751’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01292
Permit Status: Complete
Permit Description: P.067192C (KAHNA) - BORE 199' & TRENCH 30’ TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,751’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/10/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 07/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01292
Permit Description: P.067192C (KAHNA) - BORE 199' & TRENCH 30’ TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 4,751’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | work already completed, barricade set up not witnessed | |
| 01/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-activity meeting held by Travis H before work was started | |
| 01/22/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 01/22/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 01/22/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 01/22/2025 | TRSP - ROW - Final | Passed |