Permit: TR-UTL-0724-01291
Permit Details
Apply Date:
07/10/2024
Applicant:
DOONE BAKER
Description:
P.067192B (KAHNA) - BORE 2511' & TRENCH 210’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (19) HANDHOLES & PEDESTALS. OVERLASH 1,907’ OF AERIAL FIBER CABLE. Permit update 10/18/2024: Renewed for 90 days.
Permit Reviews
Permit Number - TR-UTL-0724-01291
Permit Status: Issued
Permit Description: P.067192B (KAHNA) - BORE 2511' & TRENCH 210’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (19) HANDHOLES & PEDESTALS. OVERLASH 1,907’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01291
Permit Status: Issued
Permit Description: P.067192B (KAHNA) - BORE 2511' & TRENCH 210’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (19) HANDHOLES & PEDESTALS. OVERLASH 1,907’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/10/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
07/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0724-01291
Permit Description: P.067192B (KAHNA) - BORE 2511' & TRENCH 210’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (19) HANDHOLES & PEDESTALS. OVERLASH 1,907’ OF AERIAL FIBER CABLE.
Permit update 10/18/2024: Renewed for 90 days.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | precon completed 8-22 |