Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
07/10/2024
Applicant:
Chelsey Bolinger
Description:
P.067192A (KAHNA) - BORE 4262' & TRENCH 37’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (26) HANDHOLES & PEDESTALS. Permit update 10/17/2024: Renewed for 90 days.

Permit Reviews

Permit Number - TR-UTL-0724-01290
Permit Status: Complete
Permit Description: P.067192A (KAHNA) - BORE 4262' & TRENCH 37’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (26) HANDHOLES & PEDESTALS. Permit update 10/17/2024: Renewed for 90 days.
Start Date Submittal Complete Date Status  
07/18/2024 RIGHT-OF-WAY REVIEW v.2 07/22/2024 APPROVED Review Details
07/10/2024 RIGHT-OF-WAY REVIEW v.1 07/10/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0724-01290
Permit Status: Complete
Permit Description: P.067192A (KAHNA) - BORE 4262' & TRENCH 37’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (26) HANDHOLES & PEDESTALS. Permit update 10/17/2024: Renewed for 90 days.
Total Outstanding Activity Conditions - 3
Date Name
07/18/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
07/18/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
07/18/2024 Traffic/Mobility Control Plan (MCP) approved as submitted.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0724-01290
Permit Description: P.067192A (KAHNA) - BORE 4262' & TRENCH 37’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (26) HANDHOLES & PEDESTALS. Permit update 10/17/2024: Renewed for 90 days.
Total Completed Inspections - 6
Date Description Inspector Results Comments
08/21/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/22/2025 TRSP - ROW - Barricade - Setup/Routine Passed work completed, barricade set up not witnessed
01/22/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
01/22/2025 TRSP - ROW - Barricade Takedown Passed
01/22/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
01/22/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.067192A - CITY OF TUCSON TCP - 07-10-2024_V1ORIGIN (1)_V1.PDF DOCUMENTS VIEW
GOOGLE SCREENSHOT OF WORK AREA TR-UTL-0724-01290_V2.PDF DOCUMENTS VIEW
P.067192A - CITY OF TUCSON PLANS - 07-10-2024_V1.PDF DOCUMENTS VIEW
P.067192A - CITY OF TUCSON TCP - 07-10-2024_V1.PDF DOCUMENTS VIEW