Permit: TR-UTL-0724-01280
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
548 E SPEEDWAY BL
Address NEW:
548 E SPEEDWAY BL
Apply Date:
07/08/2024
Applicant:
Cox Communications
Description:
COX TO BORE 149' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0724-01280
Permit Status: Complete
Permit Description: COX TO BORE 149' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2024 | RIGHT-OF-WAY REVIEW v.2 | 07/18/2024 | APPROVED |
| 07/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/08/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01280
Permit Status: Complete
Permit Description: COX TO BORE 149' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 07/08/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/08/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 07/08/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanos@tucsonaz.gov or James Degrood at James.degrood@tucsonaz.gov prior to start of work |
| 07/16/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01280
Permit Description: COX TO BORE 149' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/24/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/24/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/25/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/03/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed |