Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7690 E 22ND ST
Address NEW:
7690 E 22ND ST
Apply Date:
07/31/2023
Applicant:
Cox Communications
Description:
PRJ255163-1: Cox to repair conduit, Pull 38' through Existing conduit and remove and replace vault for Service Repair Order.

Permit Reviews

Permit Number - TR-UTL-0723-02167
Permit Status: Complete
Permit Description: PRJ255163-1: Cox to repair conduit, Pull 38' through Existing conduit and remove and replace vault for Service Repair Order.
Start Date Submittal Complete Date Status  
07/31/2023 RIGHT-OF-WAY REVIEW v.1 08/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0723-02167
Permit Status: Complete
Permit Description: PRJ255163-1: Cox to repair conduit, Pull 38' through Existing conduit and remove and replace vault for Service Repair Order.
Total Outstanding Activity Conditions - 2
Date Name
08/01/2023 PEDESTRIAN ACCESS
08/01/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0723-02167
Permite Description: PRJ255163-1: Cox to repair conduit, Pull 38' through Existing conduit and remove and replace vault for Service Repair Order.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/28/2023 TRSP - ROW - Recurring N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0723-02167
Permit Description: PRJ255163-1: Cox to repair conduit, Pull 38' through Existing conduit and remove and replace vault for Service Repair Order.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/29/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/04/2024 TRSP - ROW - Final/Close-Out Passed
01/04/2024 TRSP - ROW - Recurring Passed