Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0723-02140
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
303 E NAVAJO RD
Address NEW:
303 E NAVAJO RD
Apply Date:
07/27/2023
Applicant:
Description:
2595285 and 2595279 303 E. Navajo St 13-13-25SE install 2 new services front south side of address; 6lf asphalt/MLM
Permit Reviews
Permit Number - TR-UTL-0723-02140
Permit Status: Complete
Permit Description: 2595285 and 2595279 303 E. Navajo St 13-13-25SE install 2 new services front south side of address; 6lf asphalt/MLM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/27/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/27/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0723-02140
Permit Status: Complete
Permit Description: 2595285 and 2595279 303 E. Navajo St 13-13-25SE install 2 new services front south side of address; 6lf asphalt/MLM
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/27/2023 | Traffic Control set-up approved between 7AM - 5PM |
| 07/27/2023 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0723-02140
Permite Description: 2595285 and 2595279 303 E. Navajo St 13-13-25SE install 2 new services front south side of address; 6lf asphalt/MLM
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2024 | TRSP - ROW - Recurring | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0723-02140
Permit Description: 2595285 and 2595279 303 E. Navajo St 13-13-25SE install 2 new services front south side of address; 6lf asphalt/MLM
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/15/2025 | TRSP - ROW - Final/Close-Out | Passed |