Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Apply Date:
07/26/2023
Applicant:
Maricella Martinez
Description:
Verizon to install Small Wireless Facility equipment on the existing TEP utility pole within the ROW at the above address. Verizon's equipment will be installed on the pole during the Grant Road expansion project. Work to include fiber and electric utilities to the replacement pole, the only ground equipment will be fiber vaults and electric meter. Verizon Site ID: AZ_TUC_OCEAN_109

Permit Reviews

Permit Number - TR-UTL-0723-02128
Permit Status: In review
Permit Description: Verizon to install Small Wireless Facility equipment on the existing TEP utility pole within the ROW at the above address. Verizon's equipment will be installed on the pole during the Grant Road expansion project. Work to include fiber and electric utilities to the replacement pole, the only ground equipment will be fiber vaults and electric meter. Verizon Site ID: AZ_TUC_OCEAN_109
Start Date Submittal Complete Date Status  
07/27/2023 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details