Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0723-02067
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6174 E SPEEDWAY BL
Address NEW:
6174 E SPEEDWAY BL
Apply Date:
07/19/2023
Applicant:
National Barricade LLC.
Description:
WE WILL BE EXCAVATING 3 TRENCHES AT 6174 E SPEEDWAY BLVD TO REPLACE GAS MAIN AND SERVICES IN ROW IN ASPHALT AND DIRT. TRENCHES WILL BE LOCATED IN REAR OF BUILDINGS OF 6166-6266 E SPEEDWAY BLVD. PLEASE SEE SITE PLAN FOR LOCATIONS
Permit Reviews
Permit Number - TR-UTL-0723-02067
Permit Status: Complete
Permit Description: WE WILL BE EXCAVATING 3 TRENCHES AT 6174 E SPEEDWAY BLVD TO REPLACE GAS MAIN AND SERVICES IN ROW IN ASPHALT AND DIRT. TRENCHES WILL BE LOCATED IN REAR OF BUILDINGS OF 6166-6266 E SPEEDWAY BLVD. PLEASE SEE SITE PLAN FOR LOCATIONS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/19/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/19/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0723-02067
Permit Status: Complete
Permit Description: WE WILL BE EXCAVATING 3 TRENCHES AT 6174 E SPEEDWAY BLVD TO REPLACE GAS MAIN AND SERVICES IN ROW IN ASPHALT AND DIRT. TRENCHES WILL BE LOCATED IN REAR OF BUILDINGS OF 6166-6266 E SPEEDWAY BLVD. PLEASE SEE SITE PLAN FOR LOCATIONS
| Date | Description | Comments |
|---|---|---|
| 07/19/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. | |
| 07/19/2023 | Alley Restrictions | |
| 07/19/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0723-02067
Permit Description: WE WILL BE EXCAVATING 3 TRENCHES AT 6174 E SPEEDWAY BLVD TO REPLACE GAS MAIN AND SERVICES IN ROW IN ASPHALT AND DIRT. TRENCHES WILL BE LOCATED IN REAR OF BUILDINGS OF 6166-6266 E SPEEDWAY BLVD. PLEASE SEE SITE PLAN FOR LOCATIONS
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/26/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 10/26/2023 | TRSP - ROW - Recurring | Passed |