Permit: TR-UTL-0723-02035
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9361 E PALM TREE DR
Address NEW:
9361 E PALM TREE DR
Apply Date:
07/14/2023
Applicant:
Cameron Bonner
Description:
3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Permit Reviews
Permit Number - TR-UTL-0723-02035
Permit Status: Complete
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/19/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0723-02035
Permit Status: Complete
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/14/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0723-02035
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/01/2024 | TRSP - ROW - Final/Close-Out | Passed |