Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
9361 E PALM TREE DR
Apply Date:
07/14/2023
Applicant:
Cameron Bonner
Description:
3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211

Permit Reviews

Permit Number - TR-UTL-0723-02035
Permit Status: Complete
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Start Date Submittal Complete Date Status  
07/14/2023 RIGHT-OF-WAY REVIEW v.1 07/19/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0723-02035
Permit Status: Complete
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 1
Date Name
07/14/2023 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0723-02035
Permit Description: 3230x1 Site 3 - Install Approximately 416LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9663-03 and MH 9663-02 per PCRWRD standard detail 211
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/13/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/01/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3230X1 - SITE 3 FMP MAP (9361 E PALM TREE DR)_V1.PDF DOCUMENTS VIEW
DB 68103 - PAGE 3 - 9361 E PALM TREE DR - FOOTBALLS - BUMPOUT - 3230X1_V1.PDF DOCUMENTS VIEW