Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1544 E MABEL ST
Address NEW:
1544 E MABEL ST
Apply Date:
07/11/2023
Applicant:
ANGEL MORALES
Description:
*DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD....Install 2 new sewer connections for new building. Trench 2 / 10'D X 15'L X 6'W. to connect to existing sewer line.24hr closure.***

Permit Reviews

Permit Number - TR-UTL-0723-02002
Permit Status: Complete
Permit Description: *DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD....Install 2 new sewer connections for new building. Trench 2 / 10'D X 15'L X 6'W. to connect to existing sewer line.24hr closure.***
Start Date Submittal Complete Date Status  
07/12/2023 RIGHT-OF-WAY REVIEW v.1 07/12/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0723-02002
Permit Status: Complete
Permit Description: *DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD....Install 2 new sewer connections for new building. Trench 2 / 10'D X 15'L X 6'W. to connect to existing sewer line.24hr closure.***
Total Outstanding Activity Conditions - 3
Date Name
07/12/2023 Traffic control set-up approved between 9AM - 3:30PM
07/12/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
07/12/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0723-02002
Permit Description: *DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD....Install 2 new sewer connections for new building. Trench 2 / 10'D X 15'L X 6'W. to connect to existing sewer line.24hr closure.***
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/17/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/22/2023 TRSP - ROW - Final/Close-Out Passed
09/22/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1544 E MABEL ST P1 SEWER PLANS_V1.PDF DOCUMENTS VIEW
1544 E MABEL ST P1 SEWER_V1.PDF DOCUMENTS VIEW
1544 E MABEL ST P1 SEWER SITE1_V1.PDF DOCUMENTS VIEW