Permit: TR-UTL-0723-01977
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3010 S BROWN AV
Address NEW:
3010 S BROWN AV
Apply Date:
07/07/2023
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
PRJ251346-1 COX TO Excavating 124' to install NEW CATV conduit and place vaults for system tie.
Permit Reviews
Permit Number - TR-UTL-0723-01977
Permit Status: Complete
Permit Description: PRJ251346-1 COX TO Excavating 124' to install NEW CATV conduit and place vaults for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/12/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0723-01977
Permit Status: Complete
Permit Description: PRJ251346-1 COX TO Excavating 124' to install NEW CATV conduit and place vaults for system tie.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/10/2023 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/10/2023 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0723-01977
Permit Description: PRJ251346-1 COX TO Excavating 124' to install NEW CATV conduit and place vaults for system tie.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/24/2023 | TRSP - ROW - Final/Close-Out | Passed |