Permit: TR-UTL-0723-01942
Permit Details
Apply Date:
07/05/2023
Applicant:
Doone Baker
Description:
Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Permit Reviews
Permit Number - TR-UTL-0723-01942
Permit Status: Issued
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/05/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/05/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0723-01942
Permit Status: Issued
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Date | Description | Comments |
---|---|---|
07/05/2023 | * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
07/05/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0723-01942
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/08/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/16/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
04/16/2024 | TRSP - ROW - Recurring | Passed |