Permit: TR-UTL-0626-01082
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3105 N CAMPBELL AV
Address NEW:
3105 N CAMPBELL AV
Apply Date:
06/30/2026
Applicant:
Kristine Schwartz
Description:
Emergency Work- SWG crews digging in dirt to install new gas service to snack shack. 1 5x5 bellhole in dirt.
Permit Reviews
Permit Number - TR-UTL-0626-01082
Permit Status: Complete
Permit Description: Emergency Work- SWG crews digging in dirt to install new gas service to snack shack. 1 5x5 bellhole in dirt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01082
Permit Status: Complete
Permit Description: Emergency Work- SWG crews digging in dirt to install new gas service to snack shack. 1 5x5 bellhole in dirt.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/01/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/01/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/01/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/01/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/01/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-01082
Permit Description: Emergency Work- SWG crews digging in dirt to install new gas service to snack shack. 1 5x5 bellhole in dirt.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | All work completed in the dirt and all restoration completed | |
| 07/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Precon held with construction site manager. All gas work was done in less than a day. Permit was only used as a secondary if took longer than one day all work was completed within eight hour shift in Precon was held on previous permitting.All work completed in the dirt and all restoration completed | |
| 07/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All work completed in the dirt and all restoration completed | |
| 07/27/2026 | TRSP - ROW - Final | Passed | All work completed in the dirt and all restoration completed |