Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address NEW:
435 S COUNTRY CLUB RD
Apply Date:
06/30/2026
Applicant:
ANGEL MORALES
Description:
P.358402D Overbuild Bore 4883' and trench 6' to place conduit and fiber cable Place 11 pedestals/cabinets/vaults

Permit Reviews

Permit Number - TR-UTL-0626-01078
Permit Status: Fees due
Permit Description: P.358402D Overbuild Bore 4883' and trench 6' to place conduit and fiber cable Place 11 pedestals/cabinets/vaults
Start Date Submittal Complete Date Status  
06/30/2026 RIGHT-OF-WAY REVIEW v.1 07/02/2026 REQUIRES RESUBMIT Review Details
08/31/2026 RIGHT-OF-WAY REVIEW v.2 09/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01078
Permit Status: Fees due
Permit Description: P.358402D Overbuild Bore 4883' and trench 6' to place conduit and fiber cable Place 11 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 10
Date Name
07/01/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/01/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
07/01/2026 Traffic control set-up approved between 9AM - 3:30PM
09/08/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.
09/08/2026 Survey Monuments If survey markers are damaged or disturbed during construction, the contractor shall have the markers reset by a registered land surveyor in accordance with Arizona Revised Statutes (A.R.S.) § 33-103.
09/08/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary.
09/08/2026 The contractor shall protect all existing landscaping and irrigation within the work area. Any landscaping disturbed or damaged by construction activities shall be restored to equal or better condition, including replacement of plant material, decomposed granite or groundcover, irrigation components, and hardscape, as applicable. All repairs shall be completed to the satisfaction of the City Inspector at no cost to the City.
09/08/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period.
09/08/2026 The sidewalk shall remain open and ADA compliant at all times during construction. Crew- or worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented before the sidewalk is closed.
09/08/2026 Traffic Control Devices and Daily Removal Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.

Documents

File Name Document Type  
DESIGN PLAN-P.358402 CIVIL PERMIT D-C2_V2.PDF DOCUMENTS VIEW
P.358402 AERIAL SITE MAP PERMIT D (5-29-26)_V1.PDF DOCUMENTS VIEW
P.358402D COMBINED TCPS_V2.PDF DOCUMENTS VIEW