Permit: TR-UTL-0626-01069
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1735 N ORACLE RD
Address NEW:
1735 N ORACLE RD
Apply Date:
06/29/2026
Applicant:
Judy Boyer
Description:
potholing a 3x3 hole to fix wires on inline tee for gas line locating.
Permit Reviews
Permit Number - TR-UTL-0626-01069
Permit Status: Complete
Permit Description: potholing a 3x3 hole to fix wires on
inline tee for gas line locating.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2026 | REQUIRES RESUBMIT |
| 07/07/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01069
Permit Status: Complete
Permit Description: potholing a 3x3 hole to fix wires on
inline tee for gas line locating.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/30/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/30/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/30/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-01069
Permit Description: potholing a 3x3 hole to fix wires on
inline tee for gas line locating.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | they’re gonna call to give me a schedule to schedule out when they’re supposed to do the inspections | |
| 09/14/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | All permanent patch has been completed by the 411 all work complete | |
| 09/14/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All permanent patch has been completed by the 411 all work complete | |
| 09/14/2026 | TRSP - ROW - Final | Passed | All permanent patch has been completed by the 411 all work complete |