Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/29/2026
Applicant:
Daniel Missrie
Description:
THIS JOB PLACES 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.

Permit Reviews

Permit Number - TR-UTL-0626-01068
Permit Status: In review
Permit Description: THIS JOB PLACES 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.
Start Date Submittal Complete Date Status  
06/29/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details