Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/29/2026
Applicant:
Daniel Missrie
Description:
BICENTEL - SEGMENT 1 (PHASE 1) - THIS JOB PLACES 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.

Permit Reviews

Permit Number - TR-UTL-0626-01068
Permit Status: Needs resubmittal
Permit Description: BICENTEL - SEGMENT 1 (PHASE 1) - THIS JOB PLACES 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.
Start Date Submittal Complete Date Status  
07/07/2026 RIGHT-OF-WAY REVIEW v.2 N/A REQUIRES RESUBMIT Review Details
07/09/2026 RIGHT-OF-WAY REVIEW v.3 07/20/2026 REQUIRES RESUBMIT Review Details
06/29/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01068
Permit Status: Needs resubmittal
Permit Description: BICENTEL - SEGMENT 1 (PHASE 1) - THIS JOB PLACES 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.
Total Outstanding Activity Conditions - 5
Date Name
07/09/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
07/09/2026 Traffic control set-up approved between 9AM - 3:30PM
07/09/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/09/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/09/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.