Permit: TR-UTL-0626-01067
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3510 W EL CAMINO DEL CERRO
Address NEW:
3510 W EL CAMINO DEL CERRO
Apply Date:
06/29/2026
Applicant:
Garcia David
Description:
MMR Fiber - SEGMENT 1 (Plan Phase 1) - This job (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N Silverbell Rd. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE. (DTM Note-- Refer to Attachments for Related Permit from Contractor)
Permit Reviews
Permit Number - TR-UTL-0626-01067
Permit Status: Needs resubmittal
Permit Description: MMR Fiber - SEGMENT 1 (Plan Phase 1) - This job (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N Silverbell Rd. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.
(DTM Note-- Refer to Attachments for Related Permit from Contractor)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | REQUIRES RESUBMIT |
| 07/16/2026 | RIGHT-OF-WAY REVIEW v.4 | 07/20/2026 | REQUIRES RESUBMIT |
| 06/29/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 07/09/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/13/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01067
Permit Status: Needs resubmittal
Permit Description: MMR Fiber - SEGMENT 1 (Plan Phase 1) - This job (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N Silverbell Rd. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.
(DTM Note-- Refer to Attachments for Related Permit from Contractor)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 07/09/2026 | ADOT permits will be required for work in and Traffic Control within ADOT ROW |
| 07/09/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 07/09/2026 | Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW |
| 07/09/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/09/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/09/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/09/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |