Permit: TR-UTL-0626-01059
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
405 W SPEEDWAY BL
Address NEW:
405 W SPEEDWAY BL
Apply Date:
06/26/2026
Applicant:
ANGEL MORALES
Description:
P.348976A OVERBUILD TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 PEDESTAL PLACE 4009' OF AERIAL FIBER CABLE
Permit Reviews
Permit Number - TR-UTL-0626-01059
Permit Status: Needs resubmittal
Permit Description: P.348976A OVERBUILD
TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1 PEDESTAL
PLACE 4009' OF AERIAL FIBER CABLE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01059
Permit Status: Needs resubmittal
Permit Description: P.348976A OVERBUILD
TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1 PEDESTAL
PLACE 4009' OF AERIAL FIBER CABLE
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/29/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 06/29/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/29/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/29/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/29/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/29/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/29/2026 | Please see attachment for storm to shade conditions. |