Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address NEW:
405 W SPEEDWAY BL
Apply Date:
06/26/2026
Applicant:
ANGEL MORALES
Description:
P.348976A OVERBUILD TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 PEDESTAL PLACE 4009' OF AERIAL FIBER CABLE

Permit Reviews

Permit Number - TR-UTL-0626-01059
Permit Status: Fees due
Permit Description: P.348976A OVERBUILD TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 PEDESTAL PLACE 4009' OF AERIAL FIBER CABLE
Start Date Submittal Complete Date Status  
06/26/2026 RIGHT-OF-WAY REVIEW v.1 07/07/2026 REQUIRES RESUBMIT Review Details
08/19/2026 RIGHT-OF-WAY REVIEW v.2 08/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01059
Permit Status: Fees due
Permit Description: P.348976A OVERBUILD TRENCH 14' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 PEDESTAL PLACE 4009' OF AERIAL FIBER CABLE
Total Outstanding Activity Conditions - 7
Date Name
06/29/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
06/29/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/29/2026 Traffic control set-up approved between 9AM - 3:30PM
06/29/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/29/2026 Please see attachment for storm to shade conditions.