Permit: TR-UTL-0626-01055
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
7041 S 9TH AV
Address NEW:
7041 S 9TH AV
Apply Date:
06/25/2026
Applicant:
ANGEL MORALES
Description:
BORE 3911' & TRENCH 194' TO PLACE CONDUIT AND FIBER CABLE. PLACE 27 PEDESTALS
Permit Reviews
Permit Number - TR-UTL-0626-01055
Permit Status: Fees due
Permit Description: BORE 3911' & TRENCH 194' TO PLACE CONDUIT AND FIBER CABLE.
PLACE 27 PEDESTALS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01055
Permit Status: Fees due
Permit Description: BORE 3911' & TRENCH 194' TO PLACE CONDUIT AND FIBER CABLE.
PLACE 27 PEDESTALS
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/29/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/29/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 06/29/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/29/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/07/2026 | Traffic control set-up approved between 9AM - 3:30PM |