Permit: TR-UTL-0626-01040
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3401 E GAS RD
Address NEW:
3401 E GAS RD
Apply Date:
06/24/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T185589 - TEP TO REMOVE 1 POLE FROM ROW
Permit Reviews
Permit Number - TR-UTL-0626-01040
Permit Status: Inspections
Permit Description: WO T185589 - TEP TO REMOVE 1 POLE FROM ROW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/29/2026 | APPROVED |
| 06/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/25/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01040
Permit Status: Inspections
Permit Description: WO T185589 - TEP TO REMOVE 1 POLE FROM ROW
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/29/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 06/29/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 06/29/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/29/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-01040
Permit Description: WO T185589 - TEP TO REMOVE 1 POLE FROM ROW
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Ramey, job has been issued. TEP will be moving lines to new pole and await comm line transfer before removal. |