Permit: TR-UTL-0626-01039
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
5637 S CEDAR BREAKS DR
Address NEW:
5637 S CEDAR BREAKS DR
Apply Date:
06/24/2026
Applicant:
ANGEL MORALES
Description:
594 lineal feet boring; 9 feet trenching; 8 pedestals, 8 bore pits and 128 square feet of asphalt removed/replaced.
Permit Reviews
Permit Number - TR-UTL-0626-01039
Permit Status: Fees due
Permit Description: 594 lineal feet boring; 9 feet trenching; 8 pedestals, 8 bore pits and 128 square feet of asphalt removed/replaced.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01039
Permit Status: Fees due
Permit Description: 594 lineal feet boring; 9 feet trenching; 8 pedestals, 8 bore pits and 128 square feet of asphalt removed/replaced.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/25/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 06/25/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/25/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/25/2026 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/25/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/01/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |