Permit: TR-UTL-0626-01036
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
901 W CONGRESS ST
Address NEW:
901 W CONGRESS ST
Apply Date:
06/24/2026
Applicant:
Adrien Pineda
Description:
* PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED * ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0626-01036
Permit Status: Inspections
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED *
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/13/2026 | APPROVED |
| 06/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01036
Permit Status: Inspections
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED *
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/25/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 06/25/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 07/06/2026 | Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post. |
| 07/06/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/06/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-01036
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED *
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |