Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
901 W CONGRESS ST
Apply Date:
06/24/2026
Applicant:
Adrien Pineda
Description:
* PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED * ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0626-01036
Permit Status: Inspections
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED * ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Start Date Submittal Complete Date Status  
07/02/2026 RIGHT-OF-WAY REVIEW v.2 07/13/2026 APPROVED Review Details
06/24/2026 RIGHT-OF-WAY REVIEW v.1 07/01/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01036
Permit Status: Inspections
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED * ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 6
Date Name
06/25/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
06/25/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
07/06/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
07/06/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
07/06/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/06/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-01036
Permit Description: * PLEASE NOTE THAT ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH AND NO NEW DEPTH OR TRENCH WILL BE EXCAVATED * ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 5'X5' BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW