Permit: TR-UTL-0626-01035
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
226 S GRANDE AV
Address NEW:
226 S GRANDE AV
Apply Date:
06/23/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 40'X2' TRENCH IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0626-01035
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 40'X2' TRENCH IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | APPROVED |
| 06/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/25/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01035
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 40'X2' TRENCH IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 06/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/06/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 07/06/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 07/06/2026 | Field Note: Message Board Required 5 days prior to Start of Work. |
| 07/06/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/06/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-01035
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 40'X2' TRENCH IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/22/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | backfill has been completed. They will be doing the permanent patch repair on Monday of July 27, 2026. | |
| 07/30/2026 | TRSP - ROW - Final | Passed |