Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
227 S GRANDE AV
Address NEW:
227 S GRANDE AV
Apply Date:
06/23/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0626-01034
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Start Date Submittal Complete Date Status  
07/06/2026 RIGHT-OF-WAY REVIEW v.2 07/06/2026 REQUIRES RESUBMIT Review Details
06/23/2026 RIGHT-OF-WAY REVIEW v.1 06/29/2026 REQUIRES RESUBMIT Review Details
07/07/2026 RIGHT-OF-WAY REVIEW v.3 07/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01034
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 9
Date Name
06/25/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
06/25/2026 Traffic control set-up approved between 9AM - 3:30PM
06/25/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/25/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/25/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/07/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
07/07/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/07/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
07/07/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-01034
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/14/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/25/2026 TRSP - ROW - Barricade - Setup/Routine Passed
08/27/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
227 S GRANDE AVE B AIREAL_V1.PDF DOCUMENTS VIEW
227 S GRANDE AVE B SITE_V1.PDF DOCUMENTS VIEW
APC - 227 S GRANDE AVE - FLAGGING STATION - 26-059B APC_V3.PDF DOCUMENTS VIEW