Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/22/2026
Applicant:
Ilana Galluzzo
Description:
APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0626-01025
Permit Status: Issued
Permit Description: APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE
Start Date Submittal Complete Date Status  
06/22/2026 RIGHT-OF-WAY REVIEW v.1 06/26/2026 REQUIRES RESUBMIT Review Details
07/01/2026 RIGHT-OF-WAY REVIEW v.2 07/06/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01025
Permit Status: Issued
Permit Description: APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 6
Date Name
06/23/2026 Traffic control set-up approved between 9AM - 3:30PM
06/23/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/23/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
06/23/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/23/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/06/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2945 N BEAR CANYON RD 5718346_V1.PDF DOCUMENTS VIEW
2945 N BEAR CANYON RD TCP REVISED_V2.PDF DOCUMENTS VIEW