Permit: TR-UTL-0626-01025
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2945 N BEAR CANYON RD BLDG 1
Address NEW:
2945 N BEAR CANYON RD BLDG 1
Apply Date:
06/22/2026
Applicant:
Ilana Galluzzo
Description:
APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0626-01025
Permit Status: Issued
Permit Description: APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/26/2026 | REQUIRES RESUBMIT |
| 07/01/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/06/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01025
Permit Status: Issued
Permit Description: APPROX 10' W x 10' L BELL HOLE IN DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/23/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/23/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/23/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 06/23/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/23/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/06/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |