Permit: TR-UTL-0626-01023
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
63 S GRANDE AV
Address NEW:
63 S GRANDE AV
Apply Date:
06/22/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WLL NEED TO EXCAVATE 1 20'X2' TRENCH IN CITY OF TUCSON ROW THIS WILL INCLUDE 1 5'X5' BELL HOLE IN ASPHALT ROW AND 1 SIDEWALK CONCRETE PANEL ARIZONA PIPELINE WILL NEED APPROX 90 DAYS TO COMPLETE THIS WORK ORDER
Permit Reviews
Permit Number - TR-UTL-0626-01023
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WLL NEED TO EXCAVATE 1 20'X2' TRENCH IN CITY OF TUCSON ROW THIS WILL INCLUDE 1 5'X5' BELL HOLE IN ASPHALT ROW AND 1 SIDEWALK CONCRETE PANEL
ARIZONA PIPELINE WILL NEED APPROX 90 DAYS TO COMPLETE THIS WORK ORDER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/06/2026 | APPROVED |
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-UTL-0626-01023
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WLL NEED TO EXCAVATE 1 20'X2' TRENCH IN CITY OF TUCSON ROW THIS WILL INCLUDE 1 5'X5' BELL HOLE IN ASPHALT ROW AND 1 SIDEWALK CONCRETE PANEL
ARIZONA PIPELINE WILL NEED APPROX 90 DAYS TO COMPLETE THIS WORK ORDER
| Date | Description | Comments |
|---|---|---|
| 06/22/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. | |
| 06/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 06/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. | |
| 06/22/2026 | Traffic control set-up approved between 9AM - 3:30PM | |
| 06/22/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-01023
Permit Description: ARIZONA PIPELINE WLL NEED TO EXCAVATE 1 20'X2' TRENCH IN CITY OF TUCSON ROW THIS WILL INCLUDE 1 5'X5' BELL HOLE IN ASPHALT ROW AND 1 SIDEWALK CONCRETE PANEL
ARIZONA PIPELINE WILL NEED APPROX 90 DAYS TO COMPLETE THIS WORK ORDER
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/22/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | backfill has been completed. They will be doing the permanent patch repair on Monday of July 27, 2026. | |
| 10/02/2026 | TRSP - ROW - Final | Passed | Permanent patch has been installed standard T top in bike lane work completed |