Permit: TR-UTL-0626-01020
Permit Details
Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address:
2209 N 15TH AV
Address NEW:
2209 N 15TH AV
Apply Date:
06/19/2026
Applicant:
Charles Larrabee
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)30'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 2209 N 15TH AVE 08/14/26- withdrawn permit due to customer request.
Permit Reviews
Permit Number - TR-UTL-0626-01020
Permit Status: Withdrawn
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)30'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 2209 N 15TH AVE
08/14/26- withdrawn permit due to customer request.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/29/2026 | REQUIRES RESUBMIT |
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/06/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01020
Permit Status: Withdrawn
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)30'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 2209 N 15TH AVE
08/14/26- withdrawn permit due to customer request.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/22/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 06/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/22/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |