Permit: TR-UTL-0626-01016
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5350 E 16TH ST
Address NEW:
5350 E 16TH ST
Apply Date:
06/18/2026
Applicant:
Angeline Trejo
Description:
E.1600.0029716 - trench 10 feet , place innerduct and fiber, place 3048 Handhole, splice in one MH and one HH
Permit Reviews
Permit Number - TR-UTL-0626-01016
Permit Status: Inspections
Permit Description: E.1600.0029716 - trench 10 feet , place innerduct and fiber, place 3048 Handhole, splice in one MH and one HH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/14/2026 | APPROVED |
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01016
Permit Status: Inspections
Permit Description: E.1600.0029716 - trench 10 feet , place innerduct and fiber, place 3048 Handhole, splice in one MH and one HH
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 06/23/2026 | 1. Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2. Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3. Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4. Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 06/23/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/23/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/23/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/23/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/23/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/23/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
| 07/14/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-01016
Permit Description: E.1600.0029716 - trench 10 feet , place innerduct and fiber, place 3048 Handhole, splice in one MH and one HH
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |