Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
6281 E 24TH ST
Address NEW:
6281 E 24TH ST
Apply Date:
06/17/2026
Applicant:
ANGEL MORALES
Description:
P.356688B Overbuild Bore 1745' and trench 52' to place conduit and fiber cables, Place 2941' of aerial fiber cable, Place 2 pedestals and 1 handhole

Permit Reviews

Permit Number - TR-UTL-0626-01011
Permit Status: Needs resubmittal
Permit Description: P.356688B Overbuild Bore 1745' and trench 52' to place conduit and fiber cables, Place 2941' of aerial fiber cable, Place 2 pedestals and 1 handhole
Start Date Submittal Complete Date Status  
06/17/2026 RIGHT-OF-WAY REVIEW v.1 07/07/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01011
Permit Status: Needs resubmittal
Permit Description: P.356688B Overbuild Bore 1745' and trench 52' to place conduit and fiber cables, Place 2941' of aerial fiber cable, Place 2 pedestals and 1 handhole
Total Outstanding Activity Conditions - 7
Date Name
06/22/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/22/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/22/2026 Traffic control set-up approved between 9AM - 3:30PM
06/22/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/22/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/22/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/22/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.