Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6282 E 28TH ST
Address NEW:
6282 E 28TH ST
Apply Date:
06/17/2026
Applicant:
ANGEL MORALES
Description:
P.356688A Overbuild Trench 27' to place conduit and fiber cable, Place 1 handhole, place 2661' of aerial fiber cable

Permit Reviews

Permit Number - TR-UTL-0626-01010
Permit Status: Fees due
Permit Description: P.356688A Overbuild Trench 27' to place conduit and fiber cable, Place 1 handhole, place 2661' of aerial fiber cable
Start Date Submittal Complete Date Status  
06/17/2026 RIGHT-OF-WAY REVIEW v.1 06/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01010
Permit Status: Fees due
Permit Description: P.356688A Overbuild Trench 27' to place conduit and fiber cable, Place 1 handhole, place 2661' of aerial fiber cable
Total Outstanding Activity Conditions - 9
Date Name
06/22/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/22/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/22/2026 Traffic control set-up approved between 9AM - 3:30PM
06/22/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/22/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/22/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/22/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/30/2026 Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
06/30/2026 Pedestrian Assistance - No pedestrian detour is proposed. Therefore, the sidewalk shall remain open and ADA compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure

Documents

File Name Document Type  
P.356688 AERIAL SITE MAP PERMIT A (5-13-26)_V1.PDF DOCUMENTS VIEW
P.356688 CIVIL PERMIT A (6-4-26)_V1.PDF DOCUMENTS VIEW
P.356688A TCPS_V1.PDF DOCUMENTS VIEW