Permit: TR-UTL-0626-01008
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1740 E COPPER ST
Address NEW:
1740 E COPPER ST
Apply Date:
06/17/2026
Applicant:
Rene Villalobos
Description:
Emergency - after the fact - 1740 e copper st 13 14 31se, repair broken saddle, north of the lot in asphalt, 6lf. work order 3314794. ca
Permit Reviews
Permit Number - TR-UTL-0626-01008
Permit Status: Complete
Permit Description: Emergency - after the fact - 1740 e copper st 13 14 31se, repair broken saddle, north of the lot in asphalt, 6lf. work order 3314794. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01008
Permit Status: Complete
Permit Description: Emergency - after the fact - 1740 e copper st 13 14 31se, repair broken saddle, north of the lot in asphalt, 6lf. work order 3314794. ca
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/17/2026 | 1. Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2. Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3. Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4. Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 06/17/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/17/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/17/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/17/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-01008
Permit Description: Emergency - after the fact - 1740 e copper st 13 14 31se, repair broken saddle, north of the lot in asphalt, 6lf. work order 3314794. ca
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work looks to be done prior to the 411 permanent patch has been installed | |
| 08/18/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work looks to be done prior to the 411 permanent patch has been installed | |
| 08/18/2026 | TRSP - ROW - Final | Passed | Work looks to be done prior to the 411 permanent patch has been installed |